ChargingAtlas

AL / Decatur

AL · EV charging

EV charging in Decatur, AL

Here is what NREL's public data shows about EV charging in Decatur, AL. As of NREL AFDC data retrieved October 2026, Decatur has 7 public charging stations with 10 Level 2 ports, including 6 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 6 networks: ChargePoint Network (2), Non-networked (1), EV Connect (1), ENVIROSPARK (1), and 2 more.

Connectors on record: J1772 (Level 2) at 4 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.

Of these stations, 2 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 4. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Decatur compares

Who runs Decatur's DC fast charging

Network DC fast ports Share
VIALYNK 2 33%
ChargePoint Network 2 33%
Non-networked 1 17%
EV Connect 1 17%

Last verified: NREL confirmed 100% of Decatur's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (57,974 residents; Alabama 5,157,699). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Decatur has 7 public stations in all — see the map above.

StationNetworkChargingConfirmed
Lynn Layton Nissan
2402 Hwy 31 S
VIALYNK DC fast 2 DC fast · CCS (J1772 Combo) October 2026
Lynn Layton Nissan
2402 Highway 31 S
Non-networked DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2) January 2026
Bramlett Buick GMC
3305 US-31
EV Connect DC fast 1 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) August 2026
DECATURDOWNTWN STATION 2 (L)
112 2nd Avenue Northeast
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla October 2026
DECATURDOWNTWN STATION 1 (R)
112 2nd Avenue Northeast
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
Community Action Partners
1909 Central Pkwy SW
ENVIROSPARK 5 Level 2 · J1772 (Level 2) November 2025
Holiday Inn Decatur
2407 Beltline Rd
NOODOE 3 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Decatur?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Decatur

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.