AR / Batesville
AR · EV charging
EV charging in Batesville, AR
Here is what NREL's public data shows about EV charging in Batesville, AR. As of NREL AFDC data retrieved October 2026, Batesville has 8 public charging stations with 20 Level 2 ports, including 9 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 20Level 2 ports
- 9DC fast ports
- 31%Ports that are DC fast
Stations are operated across 5 networks: Blink Network (3), ChargePoint Network (2), Non-networked (1), AUTEL (1), and 1 more.
Connectors on record: J1772 (Level 2) at 6 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station.
Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Batesville compares
- 6.9 public stations per 10,000 residents — 5.8× the Arkansas rate (1.2).
- 7.8 DC fast ports per 10,000 residents — 7.8× the Arkansas rate (1).
Who runs Batesville's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| AUTEL | 4 | 44% |
| RED_E | 4 | 44% |
| ChargePoint Network | 1 | 11% |
Last verified: NREL confirmed 100% of Batesville's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (11,539 residents; Arkansas 3,088,354). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Batesville has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Autel - Mark Martin Ford 1601 Batesville Blvd | AUTEL | DC fast 4 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | August 2026 |
| Mark Martin Ford AR 1601 Batesville Blvd | RED_E | DC fast 4 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| MARKMARTINKIA ABB LEVEL2 1601 Batesville Boulevard | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | October 2026 |
| Lyon College 2300 Highland Road | Blink Network | 4 Level 2 · J1772 (Level 2) | October 2026 |
| University of Arkansas Community College Batesville 2005 White Dr | Non-networked | 2 Level 2 · NACS / Tesla | August 2026 |
| Stanley Wood 1674 Batesville Blvd | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| MARKMARTINKIA MARKMARTINKIA 1 1601 Batesville Blvd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| Scott Wood Chrysler Dodge Jeep Ram 1676 Batesville Blvd | Blink Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Batesville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Batesville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.