ChargingAtlas

AR / Batesville

AR · EV charging

EV charging in Batesville, AR

Here is what NREL's public data shows about EV charging in Batesville, AR. As of NREL AFDC data retrieved October 2026, Batesville has 8 public charging stations with 20 Level 2 ports, including 9 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: Blink Network (3), ChargePoint Network (2), Non-networked (1), AUTEL (1), and 1 more.

Connectors on record: J1772 (Level 2) at 6 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station.

Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Batesville compares

Who runs Batesville's DC fast charging

Network DC fast ports Share
AUTEL 4 44%
RED_E 4 44%
ChargePoint Network 1 11%

Last verified: NREL confirmed 100% of Batesville's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (11,539 residents; Arkansas 3,088,354). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Batesville has 8 public stations in all — see the map above.

StationNetworkChargingConfirmed
Autel - Mark Martin Ford
1601 Batesville Blvd
AUTEL DC fast 4 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) August 2026
Mark Martin Ford AR
1601 Batesville Blvd
RED_E DC fast 4 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) October 2026
MARKMARTINKIA ABB LEVEL2
1601 Batesville Boulevard
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) October 2026
Lyon College
2300 Highland Road
Blink Network 4 Level 2 · J1772 (Level 2) October 2026
University of Arkansas Community College Batesville
2005 White Dr
Non-networked 2 Level 2 · NACS / Tesla August 2026
Stanley Wood
1674 Batesville Blvd
Blink Network 2 Level 2 · J1772 (Level 2) October 2026
MARKMARTINKIA MARKMARTINKIA 1
1601 Batesville Blvd
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026
Scott Wood Chrysler Dodge Jeep Ram
1676 Batesville Blvd
Blink Network 1 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Batesville?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Batesville

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.