CA / City Of Industry
CA · EV charging
EV charging in City Of Industry, CA
Here is what NREL's public data shows about EV charging in City Of Industry, CA. As of NREL AFDC data retrieved August 2026, City Of Industry has 81 public charging stations with 149 Level 2 ports, including 36 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 81Public stations
- 149Level 2 ports
- 36DC fast ports
- 19%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 5 networks: ChargePoint Network (76), Tesla (2), Non-networked (1), Tesla Destination (1), and 1 more.
Connectors on record: J1772 (Level 2) at 76 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 3 stations; CHAdeMO at 2 stations.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 80. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. City Of Industry has 81 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| City of Industry, CA - Gale Avenue - Tesla Supercharger 18558 Gale Avenue | Tesla | DC fast 20 DC fast · NACS / Tesla | June 2026 |
| City of Industry, CA - Colima Road - Tesla Supercharger 17501 Colima Rd | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Chevrolet of Puente Hills 17300 Gale Ave | CHARGESMART_EV | DC fast 2 DC fast · CCS (J1772 Combo) | August 2026 |
| Puente Hills Nissan 17320 E Gale Ave | Non-networked | DC fast 1 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | January 2026 |
| PH SUBARU PH SUBARU 17801 Gale Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| Pacific Palms Resort - Tesla Destination 1 Industry Hills Pkwy | Tesla Destination | 4 Level 2 · NACS / Tesla | ⚠ July 2024 |
| ATRIUM ATRIUM #9 13181 Crossroads Parkway N | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | August 2026 |
| CROSSROADS 12851 #8 12851 Crossroads Pkwy S | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | August 2026 |
| 12801 12801 #1 12801 Crossroads Pkwy S | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | August 2026 |
| INDUSTRY STATION 5 600 S Brea Canyon Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | August 2026 |
⚠ 1 of City Of Industry's 81 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in City Of Industry?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near City Of Industry
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.