ChargingAtlas

CA / Loma Linda

CA · EV charging

EV charging in Loma Linda, CA

Here is what NREL's public data shows about EV charging in Loma Linda, CA. As of NREL AFDC data retrieved August 2026, Loma Linda has 29 public charging stations with 54 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 2 networks: ChargePoint Network (28), eVgo Network (1).

Connectors on record: J1772 (Level 2) at 28 stations; CCS (J1772 Combo) at 1 station.

Notable charging stations

The largest sites by port count, DC fast first. Loma Linda has 29 public stations in all — see the map above.

StationNetworkChargingConfirmed
Chase Bank - 25701 Barton Rd
25701 Barton Rd
eVgo Network DC fast 4 DC fast · CCS (J1772 Combo) August 2026
HIE LOMA LINDA REDLANDS 1
25222 Redlands Blvd
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P3 PATIENT 1
11283 Campus St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P3 PATIENT 3
11283 Campus St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P3 PATIENT 4
11283 Campus St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P3 PATIENT 2
11283 Campus St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P3 PATIENT 5
11283 Campus St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P4 PATIENT 12
11310 Anderson St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P4 PATIENT 13
11310 Anderson St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
LOMA LINDA UNIV P4 PATIENT 11
11310 Anderson St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Loma Linda?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Loma Linda

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.