ChargingAtlas

CA / Montclair

CA · EV charging

EV charging in Montclair, CA

Here is what NREL's public data shows about EV charging in Montclair, CA. As of NREL AFDC data retrieved August 2026, Montclair has 7 public charging stations with 13 Level 2 ports, including 5 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 4 networks: ChargePoint Network (3), Non-networked (2), eVgo Network (1), LOOP (1).

Connectors on record: J1772 (Level 2) at 6 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations.

Of these stations, 2 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 4. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. Montclair has 7 public stations in all — see the map above.

StationNetworkChargingConfirmed
Montclair East Shopping Center
5467 Moreno St
eVgo Network DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) August 2026
Metro Nissan of Montclair
9440 Autoplex Dr
Non-networked DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) January 2026
The Pines Apartments
9550 Fremont Ave
LOOP 6 Level 2 · J1772 (Level 2) July 2026
METRO HONDA CT4020
9399 Autoplex St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
MONTCLAIR CITY HALL
5111 Benito St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
ALEXAN KENDRY STATION 2
4825 Cypress St
ChargePoint Network 1 Level 2 · J1772 (Level 2) August 2026
XIAMEN_STATION
10588 Monte Vista Ave
Non-networked 1 Level 2 · J1772 (Level 2) ⚠ unknown

⚠ 1 of Montclair's 7 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Montclair?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Montclair

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.