ChargingAtlas

CA / Watsonville

CA · EV charging

EV charging in Watsonville, CA

Here is what NREL's public data shows about EV charging in Watsonville, CA. As of NREL AFDC data retrieved August 2026, Watsonville has 23 public charging stations with 41 Level 2 ports, including 26 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 6 networks: ChargePoint Network (13), Blink Network (6), Tesla (1), Electrify America (1), and 2 more.

Connectors on record: J1772 (Level 2) at 19 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.

Of these stations, 4 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 19. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Watsonville has 23 public stations in all — see the map above.

StationNetworkChargingConfirmed
Watsonville, CA - Tesla Supercharger
1415 Main Street
Tesla DC fast 18 DC fast · NACS / Tesla June 2026
Food Maxx 486 (Watsonville, CA)
1465 Main St
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) August 2026
Watsonville Civic Center Garage
264 Rodriguez Street
eVgo Network DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) August 2026
US Bank Watsonville
655 Main St
EVCS DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) August 2026
Civic Plaza Parking Garage
275 Main Street
Blink Network 5 Level 2 · J1772 (Level 2) August 2026
City Hall
250 Main Street
Blink Network 3 Level 2 · J1772 (Level 2) August 2026
Watsonville Municipal Airport
100 Aviation Way
Blink Network 3 Level 2 · J1772 (Level 2) August 2026
TT445 HTC EV OUTSIDE
445 Main St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
SANTA CRUZ CNTY FREEDOM BLVD 1
1430 Freedom Blvd
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
TT445 TT445 EV SOUTH
445 Main St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Watsonville?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Watsonville

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.