CO / Edgewater
CO · EV charging
EV charging in Edgewater, CO
Here is what NREL's public data shows about EV charging in Edgewater, CO. As of NREL AFDC data retrieved October 2026, Edgewater has 4 public charging stations with 4 Level 2 ports, including 14 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 4Public stations
- 4Level 2 ports
- 14DC fast ports
- 78%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (2), Electrify America (1), Tesla (1).
Connectors on record: J1772 (Level 2) at 2 stations; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Edgewater compares
- 8.2 public stations per 10,000 residents — 1.7× the Colorado rate (4.9).
- 28.7 DC fast ports per 10,000 residents — 9.9× the Colorado rate (2.9).
Who runs Edgewater's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 57% |
| Electrify America | 6 | 43% |
Last verified: NREL confirmed 100% of Edgewater's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (4,880 residents; Colorado 5,957,493). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Edgewater has 4 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Edgewater, CO - Tesla Supercharger 5505 W 20th Ave | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Target T2225 (Edgewater, CO) 1985 Sheridan Blvd. | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | October 2026 |
| EDGEWATER CC NORTH CC 1810 Harlan St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EDGEWATER CC SOUTH CC 1800 Harlan St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Edgewater?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Edgewater
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.