ChargingAtlas

CT / Stratford

CT · EV charging

EV charging in Stratford, CT

Here is what NREL's public data shows about EV charging in Stratford, CT. As of NREL AFDC data retrieved October 2026, Stratford has 11 public charging stations with 24 Level 2 ports, including 11 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: LOOP (8), Electrify America (1), eVgo Network (1), RED_E (1).

Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations.

How Stratford compares

Who runs Stratford's DC fast charging

Network DC fast ports Share
Electrify America 8 73%
LOOP 2 18%
eVgo Network 1 9%

Last verified: NREL confirmed 100% of Stratford's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (53,610 residents; Connecticut 3,675,069). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Stratford has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
Stratford Square (Stratford, CT)
411 Barnum Ave Cutoff
Electrify America DC fast 8 DC fast · CCS (J1772 Combo) October 2026
6570 Main St
6570 Main St
LOOP DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Popeyes Kitchen - Fairfield Pizza
200 E Main St
eVgo Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
999 Oronoque Ln
999 Oronoque Ln
LOOP 4 Level 2 · J1772 (Level 2) July 2026
Knapps Landing Restaurant
520 Sniffens Ln
LOOP 4 Level 2 · J1772 (Level 2) July 2026
Ryders Landing
88 Ryders Ln
LOOP 4 Level 2 · J1772 (Level 2) July 2026
SHM Stratford
50 Housatonic Ave
LOOP 4 Level 2 · J1772 (Level 2) July 2026
Ferry Blvd Service Center
734 Ferry Blvd
LOOP 2 Level 2 · J1772 (Level 2) July 2026
575 Broad St
575 Broad St
LOOP 2 Level 2 · J1772 (Level 2) July 2026
Little Pub Four
10 Washington Pkwy
LOOP 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Stratford?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Stratford

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.