FL / Brandon
FL · EV charging
EV charging in Brandon, FL
Here is what NREL's public data shows about EV charging in Brandon, FL. As of NREL AFDC data retrieved October 2026, Brandon has 6 public charging stations with 11 Level 2 ports, including 23 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 6Public stations
- 11Level 2 ports
- 23DC fast ports
- 68%Ports that are DC fast
Stations are operated across 6 networks: Tesla (1), Blink Network (1), eVgo Network (1), CHARGEUP (1), and 2 more.
Connectors on record: CCS (J1772 Combo) at 3 stations; NACS / Tesla at 2 stations; J1772 (Level 2) at 2 stations; CHAdeMO at 1 station.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Brandon compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Brandon doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, Florida has 1.9 public stations and 2.3 DC fast ports per 10,000 residents.
Who runs Brandon's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 35% |
| eVgo Network | 6 | 26% |
| WALMART | 5 | 22% |
| BP_PULSE | 4 | 17% |
Last verified: NREL confirmed 100% of Brandon's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Brandon has 6 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Brandon, FL - Tesla Supercharger 2400 W Brandon Blvd | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Plaza at Brandon Town Center 101 Brandon Town Center Dr | eVgo Network | DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Walmart EV Charging 11110 Causeway Blvd | WALMART | DC fast 5 DC fast · CCS (J1772 Combo), NACS / Tesla | September 2026 |
| Thorntons Brandon Boulevard, Brandon, FL 425 E Brandon Boulevard | BP_PULSE | DC fast 4 DC fast · CCS (J1772 Combo) | October 2026 |
| HCA- Brandon 119 Oakfield Dr | CHARGEUP | 6 Level 2 · J1772 (Level 2) | October 2026 |
| Ironwood Flats Apartments 820 South Kings Avenue | Blink Network | 5 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Brandon?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Brandon
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.