ChargingAtlas

FL / St. Cloud

FL · EV charging

EV charging in St. Cloud, FL

Here is what NREL's public data shows about EV charging in St. Cloud, FL. As of NREL AFDC data retrieved October 2026, St. Cloud has 11 public charging stations with 20 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: CHARGEUP (7), Tesla (1), EVOKE (1), EV Connect (1), and 1 more.

Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station; CHAdeMO at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How St. Cloud compares

Who runs St. Cloud's DC fast charging

Network DC fast ports Share
Tesla 8 53%
EV Connect 4 27%
FORD_CHARGE 2 13%
CHARGEUP 1 7%

Last verified: NREL confirmed 100% of St. Cloud's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (71,036 residents; Florida 23,372,215). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. St. Cloud has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
Canoe Creek, FL - Florida Turnpike Service Plaza - Tesla Supercharger
Mile Post 229, Florida's Turnpike
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Canoe Creek Service Plaza
229 Florida's Turnpike
EV Connect DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
Kisselback Ford
1118 13th St
FORD_CHARGE DC fast 2 DC fast · CCS (J1772 Combo) October 2026
Starling Chevy St Cloud
1001 Irlo Bronon Memorial Hwy
CHARGEUP DC fast 1 DC fast · CCS (J1772 Combo) October 2026
Parking Lot
2906 17th St
EVOKE 6 Level 2 · J1772 (Level 2) October 2026
Harmony
7251 Fair Oak Drive
CHARGEUP 4 Level 2 · J1772 (Level 2) October 2026
Osceola Power Plant
8400 Community Center Rd.
CHARGEUP 2 Level 2 · J1772 (Level 2) October 2026
St Cloud City Hall
1300 9th Street
CHARGEUP 2 Level 2 · J1772 (Level 2) October 2026
St Cloud Civic Center
3001 17th Street
CHARGEUP 2 Level 2 · J1772 (Level 2) October 2026
St Cloud Lakefront Park
1104 Lakeshore Blvd
CHARGEUP 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in St. Cloud?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near St. Cloud

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.