ChargingAtlas

GA / Dahlonega

GA · EV charging

EV charging in Dahlonega, GA

Here is what NREL's public data shows about EV charging in Dahlonega, GA. As of NREL AFDC data retrieved October 2026, Dahlonega has 6 public charging stations with 13 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 4 networks: ChargePoint Network (3), Tesla Destination (1), Non-networked (1), Blink Network (1).

Connectors on record: J1772 (Level 2) at 5 stations; NACS / Tesla at 1 station.

Of these stations, 2 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Dahlonega compares

Last verified: NREL confirmed 100% of Dahlonega's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (7,830 residents; Georgia 11,180,878). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Dahlonega has 6 public stations in all — see the map above.

StationNetworkChargingConfirmed
The Dahlonega Square Hotel & Villas - Tesla Destination
135 N Chestatee St
Tesla Destination 3 Level 2 · NACS / Tesla August 2026
CHOICE ST CHIOCE AVE LOT1
159 Choice Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
Kaya Vineyard & Winery
5400 Town Creek Rd
Non-networked 2 Level 2 · J1772 (Level 2) August 2026
Dahlonega Lot 15
198 Church Street
Blink Network 2 Level 2 · J1772 (Level 2) October 2026
EV STATION LOT NGMC LUMPKIN 2
495 U.S. Hwy 19
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EV STATION LOT NGMC LUMPKIN 1
495 U.S. Hwy 19
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Dahlonega?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Dahlonega

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.