GA / Louisville
GA · EV charging
EV charging in Louisville, GA
Here is what NREL's public data shows about EV charging in Louisville, GA. As of NREL AFDC data retrieved October 2026, Louisville has 3 public charging stations with 2 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 3Public stations
- 2Level 2 ports
- 2DC fast ports
- 50%Ports that are DC fast
Stations are operated across 1 network: ChargePoint Network (3).
Connectors on record: CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations; J1772 (Level 2) at 1 station.
How Louisville compares
- 13.5 public stations per 10,000 residents — 6.4× the Georgia rate (2.1).
- 9 DC fast ports per 10,000 residents — 4.3× the Georgia rate (2.1).
Who runs Louisville's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| ChargePoint Network | 2 | 100% |
Last verified: NREL confirmed 100% of Louisville's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (2,223 residents; Georgia 11,180,878). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Louisville has 3 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| GEORGIA POWER LOUISVILLE DC2 250 W Broad St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| GEORGIA POWER LOUISVILLE DC1 250 W Broad St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| JEFFERSONENERGY OGEECHEE 1 1928 T E Buchanan Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Louisville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Louisville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.