ChargingAtlas

GA / Madison

GA · EV charging

EV charging in Madison, GA

Here is what NREL's public data shows about EV charging in Madison, GA. As of NREL AFDC data retrieved October 2026, Madison has 8 public charging stations with 13 Level 2 ports, including 21 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: ChargePoint Network (5), Tesla (1), ENVIROSPARK (1), BP_PULSE (1).

Connectors on record: J1772 (Level 2) at 5 stations; NACS / Tesla at 2 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Madison compares

Who runs Madison's DC fast charging

Network DC fast ports Share
BP_PULSE 12 57%
Tesla 8 38%
ChargePoint Network 1 5%

Last verified: NREL confirmed 100% of Madison's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (5,131 residents; Georgia 11,180,878). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Madison has 8 public stations in all — see the map above.

StationNetworkChargingConfirmed
TA Eatonton Road, Madison, GA
2021 Eatonon Road
BP_PULSE DC fast 12 DC fast · CCS (J1772 Combo), NACS / Tesla October 2026
Madison, GA - Tesla Supercharger
2012 Eatonton Road
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
GEORGIA POWER CAPTAIN D MADI
1910 Eatonton Rd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
City of Madison
120 S Main St
ENVIROSPARK 5 Level 2 · J1772 (Level 2) November 2025
GEORGIA POWER CAPTAIN D L2
1910 Eatonton Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
AIP MADISON 3
100 Amtico Road
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
AIP MADISON 2
100 Amtico Road
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
AIP MADISON 1
100 Amtico Road
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Madison?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Madison

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.