ChargingAtlas

IL / Matteson

IL · EV charging

EV charging in Matteson, IL

Here is what NREL's public data shows about EV charging in Matteson, IL. As of NREL AFDC data retrieved October 2026, Matteson has 11 public charging stations with 7 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 7 networks: ChargePoint Network (4), Blink Network (2), Non-networked (1), EV Connect (1), and 3 more.

Connectors on record: CCS (J1772 Combo) at 8 stations; J1772 (Level 2) at 4 stations; CHAdeMO at 3 stations; NACS / Tesla at 2 stations.

Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Matteson compares

Who runs Matteson's DC fast charging

Network DC fast ports Share
EV Connect 4 22%
UNIVERSAL 4 22%
Blink Network 4 22%
NAYAX_ENERGY 2 11%
VIALYNK 2 11%
ChargePoint Network 2 11%

Last verified: NREL confirmed 100% of Matteson's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (18,566 residents; Illinois 12,710,158). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Matteson has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
Arnie Bauer Buick GMC Cadillac
5525 MILLER CIRCLE DRIVE
EV Connect DC fast 4 DC fast · CCS (J1772 Combo) October 2026
Quality Inn & Suites Matteson near I-57
21050 Matteson Ave
UNIVERSAL DC fast 4 DC fast · CCS (J1772 Combo) November 2025
Gerald Honda of Matteson
5355 Miller Circle Drive
Blink Network DC fast 2 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) October 2026
Sutton Ford - DCFC
21315 Central Avenue
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) October 2026
Gerald Nissan - Matteson
5513 Miller Cir Dr
NAYAX_ENERGY DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) January 2026
Gerald Nissan of Matteson, INC.
5513 Miller Circle Drive
VIALYNK DC fast 2 DC fast · CCS (J1772 Combo) October 2026
WORLD HYUNDAI LEVEL 3-01
5337 Miller Cir Dr
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
WORLD HYUNDAI LEVEL 3-02
5337 Miller Cir Dr
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
DISTRICT 227 DISTRICT EV 2
20500 Cicero Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2), NACS / Tesla October 2026
DISTRICT 227 DISTRICT EV 1
20500 Cicero Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2), NACS / Tesla October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Matteson?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Matteson

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.