ChargingAtlas

IL / Mattoon

IL · EV charging

EV charging in Mattoon, IL

Here is what NREL's public data shows about EV charging in Mattoon, IL. As of NREL AFDC data retrieved October 2026, Mattoon has 19 public charging stations with 24 Level 2 ports, including 12 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 4 networks: ChargePoint Network (12), Blink Network (3), Non-networked (2), TURNONGREEN (2).

Connectors on record: J1772 (Level 2) at 12 stations; CCS (J1772 Combo) at 7 stations; CHAdeMO at 4 stations; NACS / Tesla at 1 station.

Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 18. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Mattoon compares

Who runs Mattoon's DC fast charging

Network DC fast ports Share
Blink Network 8 67%
ChargePoint Network 3 25%
Non-networked 1 8%

Last verified: NREL confirmed 95% of Mattoon's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (16,602 residents; Illinois 12,710,158). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Mattoon has 19 public stations in all — see the map above.

StationNetworkChargingConfirmed
Emerald Acres Shoppes
1300 Remington Road
Blink Network DC fast 4 DC fast · CCS (J1772 Combo) October 2026
Pilson Chrysler Dodge Jeep RAM-L3
2212 Lake Land Blvd
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) October 2026
Pilson Ford-L3
2000 Lake Land Boulevard
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) October 2026
KC Summers Nissan
2404 Lake Land Blvd
Non-networked DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) January 2026
KC EV 1 LVL 3 HYUN NE
2011 Charleston Ave
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
KC EV 1 LVL 3 HYUN NW
2011 Charleston Ave
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
LIFT BUILDING DC CHARGER
113 S 17th St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
SBLHC MOB SBLHC #1
1000 Health Center dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
SBLHC MOB SBLHC #2
1000 Health Center dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
LAKE LAND COLLE POWER HOUSE
5001 Lake Land Blvd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Mattoon?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Mattoon

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.