IL / Oswego
IL · EV charging
EV charging in Oswego, IL
Here is what NREL's public data shows about EV charging in Oswego, IL. As of NREL AFDC data retrieved October 2026, Oswego has 5 public charging stations with 4 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 4Level 2 ports
- 18DC fast ports
- 82%Ports that are DC fast
Stations are operated across 4 networks: Blink Network (2), Electrify America (1), ChargePoint Network (1), Tesla (1).
Connectors on record: CCS (J1772 Combo) at 2 stations; J1772 (Level 2) at 2 stations; CHAdeMO at 1 station; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Oswego compares
- 1.3 public stations per 10,000 residents — 87% of the Illinois rate (1.5).
- 4.6 DC fast ports per 10,000 residents — 2.0× the Illinois rate (2.3).
Who runs Oswego's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 12 | 67% |
| Electrify America | 4 | 22% |
| Blink Network | 2 | 11% |
Last verified: NREL confirmed 100% of Oswego's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (38,778 residents; Illinois 12,710,158). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Oswego has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Oswego, IL - Tesla Supercharger 2700 US-34 | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Meijer Oswego (Oswego, IL) 2700 US-34 | Electrify America | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Public Charger East - DCFC 2200 U.S. 30 | Blink Network | DC fast 2 DC fast · CCS (J1772 Combo) | October 2026 |
| FOXP1SOUTH FOX METRO 1 682 State Rte 31 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| PUBLIC CHARGER EAST (L2) 2200 U.S. 30 | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Oswego?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Oswego
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.