IN / Corydon
IN · EV charging
EV charging in Corydon, IN
Here is what NREL's public data shows about EV charging in Corydon, IN. As of NREL AFDC data retrieved October 2026, Corydon has 5 public charging stations with 10 Level 2 ports, including 5 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 10Level 2 ports
- 5DC fast ports
- 33%Ports that are DC fast
Stations are operated across 4 networks: EV Connect (2), Blink Network (1), CHARGELAB (1), VIALYNK (1).
Connectors on record: J1772 (Level 2) at 3 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
How Corydon compares
- 15.9 public stations per 10,000 residents — 14.5× the Indiana rate (1.1).
- 15.9 DC fast ports per 10,000 residents — 10.6× the Indiana rate (1.5).
Who runs Corydon's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| EV Connect | 5 | 100% |
Last verified: NREL confirmed 100% of Corydon's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (3,153 residents; Indiana 6,924,275). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Corydon has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Corydon 109 W Poplar Street | EV Connect | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| John Jones Chev Buick of Corydon 1735 Gardner Ln NW | EV Connect | DC fast 1 DC fast · CCS (J1772 Combo) | October 2026 |
| Eckart 426 Quarry Road NW | CHARGELAB | 6 Level 2 · J1772 (Level 2) | October 2026 |
| Heritage Ford Of Indiana - Series 2075 Edsel Lane Northwest | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Holiday Inn Express Cordyon 249 Federal Dr NW | VIALYNK | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Corydon?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Corydon
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.