ChargingAtlas

IN / Greenfield

IN · EV charging

EV charging in Greenfield, IN

Here is what NREL's public data shows about EV charging in Greenfield, IN. As of NREL AFDC data retrieved October 2026, Greenfield has 7 public charging stations with 8 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: ChargePoint Network (3), Blink Network (3), eVgo Network (1).

Connectors on record: J1772 (Level 2) at 4 stations; CCS (J1772 Combo) at 3 stations.

How Greenfield compares

Who runs Greenfield's DC fast charging

Network DC fast ports Share
eVgo Network 6 60%
Blink Network 4 40%

Last verified: NREL confirmed 100% of Greenfield's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (26,268 residents; Indiana 6,924,275). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Greenfield has 7 public stations in all — see the map above.

StationNetworkChargingConfirmed
Pilot Travel Center 30
2640 North 600 West
eVgo Network DC fast 6 DC fast · CCS (J1772 Combo) October 2026
Dellen Chevrolet-Buick-GMC
2527 W Main St
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) October 2026
Dellen Dodge-Chrysler-Jeep-Ram
2527 West Main Street
Blink Network DC fast 2 DC fast · CCS (J1772 Combo) October 2026
COG DOWNTOWN
20 W Main St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
NINESTAR EV 1
2331 E 600 N
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
COG MAYOR STATION
6 W South St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
The Nest By Star Abode
334 Barrett Dr.
Blink Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Greenfield?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Greenfield

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.