IN / Greenwood
IN · EV charging
EV charging in Greenwood, IN
Here is what NREL's public data shows about EV charging in Greenwood, IN. As of NREL AFDC data retrieved October 2026, Greenwood has 12 public charging stations with 14 Level 2 ports, including 26 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 12Public stations
- 14Level 2 ports
- 26DC fast ports
- 65%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (8), Blink Network (2), Tesla (1), Electrify America (1).
Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 11. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Greenwood compares
- 1.8 public stations per 10,000 residents — 1.6× the Indiana rate (1.1).
- 3.8 DC fast ports per 10,000 residents — 2.5× the Indiana rate (1.5).
Who runs Greenwood's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Electrify America | 12 | 46% |
| Tesla | 8 | 31% |
| Blink Network | 4 | 15% |
| ChargePoint Network | 2 | 8% |
Last verified: NREL confirmed 100% of Greenwood's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (68,175 residents; Indiana 6,924,275). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Greenwood has 12 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Menards Greenwood 3169 (Greenwood, IN) 300 Marlin Dr | Electrify America | DC fast 12 DC fast · CCS (J1772 Combo) | October 2026 |
| Target - Tesla Supercharger 895 S State Rd 135 | Tesla | DC fast 8 DC fast · NACS / Tesla | July 2026 |
| Skillman Ford - DCFC 1250 U.S. 31 South | Blink Network | DC fast 4 DC fast · CCS (J1772 Combo) | October 2026 |
| HYUNDAISOUTH CPE250 SALES 1300 US 31 S | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| HYUNDAISOUTH CPE250 PDI 1300 US 31 S | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| VisionQuest Eyecare - Greenwood 2887 South State Road 135 | Blink Network | 4 Level 2 · J1772 (Level 2) | October 2026 |
| ARBONNE STATION 1 800 Commerce Pkwy W Dr Suite B | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| JCBANK GREENWOOD 2871 S State Rd 135 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| FSC CHARGING BUILDING 9 1530 Spring Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| FSC CHARGING BUILDING 11 2865 Maple Leaf Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Greenwood?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Greenwood
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.