KS / Mission
KS · EV charging
EV charging in Mission, KS
Here is what NREL's public data shows about EV charging in Mission, KS. As of NREL AFDC data retrieved October 2026, Mission has 13 public charging stations with 24 Level 2 ports, including 20 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 13Public stations
- 24Level 2 ports
- 20DC fast ports
- 45%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (12), Tesla (1).
Connectors on record: J1772 (Level 2) at 12 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Mission compares
- 13 public stations per 10,000 residents — 6.8× the Kansas rate (1.9).
- 20 DC fast ports per 10,000 residents — 15.4× the Kansas rate (1.3).
Who runs Mission's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 20 | 100% |
Last verified: NREL confirmed 100% of Mission's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (10,013 residents; Kansas 2,970,606). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Mission has 13 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Mission, KS - Tesla Supercharger 6655 Martway Street | Tesla | DC fast 20 DC fast · NACS / Tesla | June 2026 |
| EVERGY @SCRIPTPRO-169C 5839 Woodson Rd @ ScriptPro | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EVERGY @BRILL -214C 5820 Lamar Ave @ Brill Eye Center | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| JOHNSON COUNTY DMV 6000 Lamar Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EVERGY @SCRIPTPRO-169B 5839 Woodson Rd @ ScriptPro | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EVERGY @SCRIPTPRO-169A 5839 Woodson Rd @ ScriptPro | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EVERGY @BRILL -214B 5820 Lamar Ave @ Brill Eye Center | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EVERGY @BRILL -214A 5820 Lamar Ave @ Brill Eye Center | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| MERRIAM POLICE DEPT 9010 W 62nd St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| MERRIAM MCC ADA 6114 Slater St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Mission?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Mission
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.