KY / Georgetown
KY · EV charging
EV charging in Georgetown, KY
Here is what NREL's public data shows about EV charging in Georgetown, KY. As of NREL AFDC data retrieved October 2026, Georgetown has 5 public charging stations with 6 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 6Level 2 ports
- 8DC fast ports
- 57%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (3), Electrify America (1), eVgo Network (1).
Connectors on record: J1772 (Level 2) at 3 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
How Georgetown compares
- 1.2 public stations per 10,000 residents — 1.3× the Kentucky rate (0.9).
- 2 DC fast ports per 10,000 residents — 2.0× the Kentucky rate (1).
Who runs Georgetown's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Electrify America | 4 | 50% |
| eVgo Network | 4 | 50% |
Last verified: NREL confirmed 100% of Georgetown's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (40,518 residents; Kentucky 4,588,372). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Georgetown has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Walmart 571 (Georgetown, KY) 112 Osborne Way | Electrify America | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Pilot Travel Center 353 110 Triport Road | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | October 2026 |
| CLARK'S PNS56 CLARK'S PNS82-2 381 Cherry Blossom Spur | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CLARK'S PNS56 CLARK'S PNS82 381 Cherry Blossom Spur | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| GLOWBRANDS PF GEORGETOWN 101 Fitness Path | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Georgetown?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Georgetown
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.