MA / Dalton
MA · EV charging
EV charging in Dalton, MA
Here is what NREL's public data shows about EV charging in Dalton, MA. As of NREL AFDC data retrieved October 2026, Dalton has 8 public charging stations with 14 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 14Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 2 networks: ChargePoint Network (7), Non-networked (1).
Connectors on record: J1772 (Level 2) at 7 stations; NEMA 5-15 (Level 1) at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.
How Dalton compares
- 12.9 public stations per 10,000 residents — 2.0× the Massachusetts rate (6.5).
- 0 DC fast ports per 10,000 residents (Massachusetts: 2.8).
Last verified: NREL confirmed 100% of Dalton's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (6,198 residents; Massachusetts 7,136,171). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Dalton has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| STATIONERY FACT EV 1 63 Flansburg Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| WAHCONAH RHS STATION 3 150 Old Windsor Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| WAHCONAH RHS STATION 2 150 Old Windsor Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| WAHCONAH RHS STATION 1 150 Old Windsor Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| TOWN OF DALTON DALTON CRA 2 400 Main Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| TOWN OF DALTON DALTON CRA 1 400 Main Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| TOWN OF DALTON DALTON COA 40 Field Street Extension | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Dalton Council On Aging 40 Field St | Non-networked | Charging · NEMA 5-15 (Level 1) | December 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Dalton?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Dalton
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.