MA / Greenfield
MA · EV charging
EV charging in Greenfield, MA
Here is what NREL's public data shows about EV charging in Greenfield, MA. As of NREL AFDC data retrieved October 2026, Greenfield has 27 public charging stations with 52 Level 2 ports, including 7 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 27Public stations
- 52Level 2 ports
- 7DC fast ports
- 12%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (21), Non-networked (4), Blink Network (1), FLO (1).
Connectors on record: J1772 (Level 2) at 25 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 1 station.
Of these stations, 3 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 24. Always confirm current pricing with the network before you charge.
How Greenfield compares
- 15.3 public stations per 10,000 residents — 2.4× the Massachusetts rate (6.5).
- 4 DC fast ports per 10,000 residents — 1.4× the Massachusetts rate (2.8).
Who runs Greenfield's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Blink Network | 4 | 57% |
| ChargePoint Network | 2 | 29% |
| Non-networked | 1 | 14% |
Last verified: NREL confirmed 100% of Greenfield's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (17,633 residents; Massachusetts 7,136,171). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Greenfield has 27 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Ford of Greenfield 1 Main Street | Blink Network | DC fast 4 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| Big Y 237 Mohawk Trail | Non-networked | DC fast 1 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | December 2025 |
| BIG Y FOODS MOHAWK TRAIL #1 249a Mohawk Trail | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | October 2026 |
| GREENFIELD TOY TOYOTA OF GFLD 1 Main St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Franklin County Sheriff's Office 160 Elm St | Non-networked | 4 Level 2 · J1772 (Level 2) | February 2026 |
| Chapman Davis Parking Lot 51 Chapman St | Non-networked | 2 Level 2 · J1772 (Level 2) | September 2026 |
| Greenfield City Hall 14 Court Square | Non-networked | 2 Level 2 · J1772 (Level 2) | September 2026 |
| GREENFIELDMA OLIVE ST 04 11 Olive St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| GREENFIELDMA OLIVE ST 03 11 Olive St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| GREENFIELDMA OLIVE ST 01 11 Olive St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Greenfield?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Greenfield
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.