ChargingAtlas

MA / Weston

MA · EV charging

EV charging in Weston, MA

Here is what NREL's public data shows about EV charging in Weston, MA. As of NREL AFDC data retrieved October 2026, Weston has 6 public charging stations with 26 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: ChargePoint Network (3), AMPUP (2), Blink Network (1).

Connectors on record: J1772 (Level 2) at 6 stations.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.

How Weston compares

Last verified: NREL confirmed 67% of Weston's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (11,827 residents; Massachusetts 7,136,171). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Weston has 6 public stations in all — see the map above.

StationNetworkChargingConfirmed
The Cambridge School of Weston Upper Lot
45 Georgian Road
Blink Network 14 Level 2 · J1772 (Level 2) October 2026
Center St Shopping Center
21 Center St
AMPUP 4 Level 2 · J1772 (Level 2) ⚠ October 2022
Center Street Shopping Plaza
21 Center St
AMPUP 4 Level 2 · J1772 (Level 2) August 2025
TOWN OF WESTON BROOK SCH APT 1
44 School St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
RIVERS SCHOOL RIVERS GW1
333 Winter St
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026
RIVERS SCHOOL RIVERS GW2
333 Winter St
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026

⚠ 1 of Weston's 6 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Weston?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Weston

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.