MD / North Bethesda
MD · EV charging
EV charging in North Bethesda, MD
Here is what NREL's public data shows about EV charging in North Bethesda, MD. As of NREL AFDC data retrieved October 2026, North Bethesda has 16 public charging stations with 65 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 16Public stations
- 65Level 2 ports
- 8DC fast ports
- 11%Ports that are DC fast
Stations are operated across 5 networks: ChargePoint Network (9), Blink Network (3), CHARGELAB (2), Tesla (1), and 1 more.
Connectors on record: J1772 (Level 2) at 15 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How North Bethesda compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. North Bethesda doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, Maryland has 2.7 public stations and 2.5 DC fast ports per 10,000 residents.
Who runs North Bethesda's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 100% |
Last verified: NREL confirmed 100% of North Bethesda's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. North Bethesda has 16 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| North Bethesda, MD - Tesla Supercharger 11860 Trade Street | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| 915 Meeting 915 Meeting Street | NOODOE | 30 Level 2 · J1772 (Level 2) | October 2026 |
| Montgomery County Conference Center 5939 Executive Blvd | CHARGELAB | 6 Level 2 · J1772 (Level 2) | October 2026 |
| 431703 Avalon at Grosvenor Station 10306 Strathmore Hall Street | Blink Network | 4 Level 2 · J1772 (Level 2) | October 2026 |
| Bethesda North Marriott Hotel & Conference Center 5701 Marinelli Road | CHARGELAB | 4 Level 2 · J1772 (Level 2) | October 2026 |
| BLK 3 PANDR P&R-B3 P1_3,4 911 Prose St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BLK 3 PANDR P&R-B3 P2_3,4 911 Prose St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BLK 3 PANDR P&R-B3 P2_1,2 911 Prose St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BLK 3 PANDR P&R-B3 P2_5,6 911 Prose St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BLK 3 PANDR P&R-B3 P2_7,8 911 Prose St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in North Bethesda?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near North Bethesda
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.