ChargingAtlas

MD / Thurmont

MD · EV charging

EV charging in Thurmont, MD

Here is what NREL's public data shows about EV charging in Thurmont, MD. As of NREL AFDC data retrieved October 2026, Thurmont has 5 public charging stations with 5 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 2 networks: ChargePoint Network (3), Non-networked (2).

Connectors on record: J1772 (Level 2) at 3 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 2 stations.

Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Thurmont compares

Who runs Thurmont's DC fast charging

Network DC fast ports Share
ChargePoint Network 2 100%

Last verified: NREL confirmed 100% of Thurmont's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (6,308 residents; Maryland 6,263,220). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Thurmont has 5 public stations in all — see the map above.

StationNetworkChargingConfirmed
AMPCAP RR L3 - 1
203 Frederick Road
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla October 2026
AMPCAP RR L3 - 2
203 Frederick Road
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla October 2026
Catoctin Mountain Park - Visitor Center
14707 Park Central Rd
Non-networked 2 Level 2 · J1772 (Level 2) January 2026
POTOMAC EDISON CATOCTIN FURNAC
12698 Catoctin Furnace Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
Catoctin Mountain Park - Headquarters
6602 Foxville Rd
Non-networked 1 Level 2 · J1772 (Level 2) January 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Thurmont?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Thurmont

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.