ChargingAtlas

ME / Orono

ME · EV charging

EV charging in Orono, ME

Here is what NREL's public data shows about EV charging in Orono, ME. As of NREL AFDC data retrieved October 2026, Orono has 4 public charging stations with 4 Level 2 ports, including 7 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: Blink Network (2), JULE (1), ELECTRIC_ERA (1).

Connectors on record: J1772 (Level 2) at 2 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 2 stations; CHAdeMO at 1 station.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Orono compares

Who runs Orono's DC fast charging

Network DC fast ports Share
ELECTRIC_ERA 4 57%
JULE 3 43%

Last verified: NREL confirmed 100% of Orono's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (12,199 residents; Maine 1,405,012). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Orono has 4 public stations in all — see the map above.

StationNetworkChargingConfirmed
Electric Era Charging Station
103 Park St.
ELECTRIC_ERA DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla October 2026
University of Maine - Peace Studies Building
5725 E Annex, Rm 202
JULE DC fast 3 DC fast · CHAdeMO, CCS (J1772 Combo), NACS / Tesla December 2025
Town of Orono, Town Office
59 Main Street
Blink Network 2 Level 2 · J1772 (Level 2) October 2026
Orono Public Library
10 Birch Street
Blink Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Orono?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Orono

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.