MI / Howell
MI · EV charging
EV charging in Howell, MI
Here is what NREL's public data shows about EV charging in Howell, MI. As of NREL AFDC data retrieved October 2026, Howell has 7 public charging stations with 9 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 9Level 2 ports
- 16DC fast ports
- 64%Ports that are DC fast
Stations are operated across 3 networks: RED_E (4), ChargePoint Network (2), eVgo Network (1).
Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Howell compares
- 7.1 public stations per 10,000 residents — 3.5× the Michigan rate (2).
- 16.1 DC fast ports per 10,000 residents — 8.9× the Michigan rate (1.8).
Who runs Howell's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| eVgo Network | 10 | 63% |
| RED_E | 6 | 38% |
Last verified: NREL confirmed 100% of Howell's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (9,914 residents; Michigan 10,140,459). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Howell has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Kensington Valley Outlets 1475 N Burkart Rd | eVgo Network | DC fast 10 DC fast · CCS (J1772 Combo) | October 2026 |
| Bob Maxey Ford of Howell 2798 E Grand River Ave | RED_E | DC fast 4 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| Shell Howell 3990 Grand Oaks Dr | RED_E | DC fast 2 DC fast · CCS (J1772 Combo), NACS / Tesla | October 2026 |
| Waldenwoods Resort and Conference Center 2975 Old US 23 | RED_E | 3 Level 2 · J1772 (Level 2) | October 2026 |
| Howell N State St Municipal Parking 200 E Grand River Ave | RED_E | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CONSUMERSENERGY HOW-EVSE-1 1000 Grand Oaks Drive | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| CONSUMERSENERGY HOW-EVSE-2 1000 Grand Oaks Dr | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Howell?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Howell
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.