ChargingAtlas

MI / Howell

MI · EV charging

EV charging in Howell, MI

Here is what NREL's public data shows about EV charging in Howell, MI. As of NREL AFDC data retrieved October 2026, Howell has 7 public charging stations with 9 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: RED_E (4), ChargePoint Network (2), eVgo Network (1).

Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Howell compares

Who runs Howell's DC fast charging

Network DC fast ports Share
eVgo Network 10 63%
RED_E 6 38%

Last verified: NREL confirmed 100% of Howell's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (9,914 residents; Michigan 10,140,459). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Howell has 7 public stations in all — see the map above.

StationNetworkChargingConfirmed
Kensington Valley Outlets
1475 N Burkart Rd
eVgo Network DC fast 10 DC fast · CCS (J1772 Combo) October 2026
Bob Maxey Ford of Howell
2798 E Grand River Ave
RED_E DC fast 4 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) October 2026
Shell Howell
3990 Grand Oaks Dr
RED_E DC fast 2 DC fast · CCS (J1772 Combo), NACS / Tesla October 2026
Waldenwoods Resort and Conference Center
2975 Old US 23
RED_E 3 Level 2 · J1772 (Level 2) October 2026
Howell N State St Municipal Parking
200 E Grand River Ave
RED_E 2 Level 2 · J1772 (Level 2) October 2026
CONSUMERSENERGY HOW-EVSE-1
1000 Grand Oaks Drive
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026
CONSUMERSENERGY HOW-EVSE-2
1000 Grand Oaks Dr
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Howell?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Howell

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.