ChargingAtlas

MI / Hudsonville

MI · EV charging

EV charging in Hudsonville, MI

Here is what NREL's public data shows about EV charging in Hudsonville, MI. As of NREL AFDC data retrieved October 2026, Hudsonville has 6 public charging stations with 5 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: ChargePoint Network (2), Tesla (1), Electrify America (1), EV Connect (1), and 1 more.

Connectors on record: J1772 (Level 2) at 3 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Hudsonville compares

Who runs Hudsonville's DC fast charging

Network DC fast ports Share
Tesla 10 56%
Electrify America 6 33%
EV Connect 2 11%

Last verified: NREL confirmed 100% of Hudsonville's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (7,985 residents; Michigan 10,140,459). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Hudsonville has 6 public stations in all — see the map above.

StationNetworkChargingConfirmed
Hudsonville, MI - Tesla Supercharger
4075 32nd Avenue
Tesla DC fast 10 DC fast · NACS / Tesla June 2026
Meijer 254 (Hudsonville, MI)
4075 32nd Ave
Electrify America DC fast 6 DC fast · CCS (J1772 Combo) October 2026
Todd Wenzel of Hudsonville
3156 Highland Dr
EV Connect DC fast 2 DC fast · CCS (J1772 Combo) October 2026
HUDSONVILLEPS HHS-FH-NORTH
5155 32nd Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HUDSONVILLEPS HHS-FH-SOUTH
5155 32nd Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
Prospect Flats
3233 Prospect St
RED_E 1 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Hudsonville?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Hudsonville

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.