ChargingAtlas

MN / Bemidji

MN · EV charging

EV charging in Bemidji, MN

Here is what NREL's public data shows about EV charging in Bemidji, MN. As of NREL AFDC data retrieved October 2026, Bemidji has 6 public charging stations with 6 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 5 networks: CHARGELAB (2), Non-networked (1), ZEFNET (1), Tesla (1), and 1 more.

Connectors on record: J1772 (Level 2) at 4 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.

Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Bemidji compares

Who runs Bemidji's DC fast charging

Network DC fast ports Share
Tesla 8 53%
CHARGELAB 4 27%
ZEFNET 2 13%
EV Connect 1 7%

Last verified: NREL confirmed 100% of Bemidji's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (15,733 residents; Minnesota 5,793,151). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Bemidji has 6 public stations in all — see the map above.

StationNetworkChargingConfirmed
Bemidji, MN - Tesla Supercharger
2000 Paul Bunyan Drive Northwest
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Bemidji
1111 Event Center Drive Northeast
CHARGELAB DC fast 4 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) October 2026
City Of Bemidji
317 4th Street Northwest
ZEFNET DC fast 2 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) October 2026
Dondelinger Chevrolet-Buick
2310 PAUL BUNYAN DR NW
EV Connect DC fast 1 DC fast · CCS (J1772 Combo) October 2026
Bemidji
4111 Technology Drive NW
CHARGELAB 2 Level 2 · J1772 (Level 2) October 2026
Paul Bunyan Park
300 Bemidji Ave
Non-networked 1 Level 2 · J1772 (Level 2) November 2025

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Bemidji?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Bemidji

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.