ChargingAtlas

MN / Mankato

MN · EV charging

EV charging in Mankato, MN

Here is what NREL's public data shows about EV charging in Mankato, MN. As of NREL AFDC data retrieved August 2026, Mankato has 13 public charging stations with 22 Level 2 ports, including 6 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: ChargePoint Network (6), Tesla Destination (3), EV Connect (2), Blink Network (2).

Connectors on record: J1772 (Level 2) at 10 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 1 station.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Mankato has 13 public stations in all — see the map above.

StationNetworkChargingConfirmed
Snell Indoor Auto Center
1900 Madison Ave
EV Connect DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) August 2026
Xcel Energy - Mankato, MN
3010 Adam St
EV Connect DC fast 2 DC fast · CCS (J1772 Combo) August 2026
HYUNDAI MANKATO DC FAST 1
1281 Raintree Rd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) August 2026
AmericInn Hotel & Conference Center - Tesla Destination
240 Stadium Rd
Tesla Destination 3 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Courtyard By Marriott Hotel & Event Center - Tesla Destination
901 Raintree Rd
Tesla Destination 3 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Luther Mankato Honda
308 Raintree Road
Blink Network 3 Level 2 · J1772 (Level 2) August 2026
MINNESOTA STATE LOT 11A - 2
West Road - Lot 11A
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
MINNESOTA STATE LOT 11A - 1
West Road - Lot 11A
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
Harrison Ford of Mankato - Level2
1935 Madison Avenue
Blink Network 2 Level 2 · J1772 (Level 2) August 2026
WHITEKNIGHT EAST HEIGHTS 1
125 Roosevelt Cir
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026

⚠ 3 of Mankato's 13 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Mankato?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Mankato

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.