MN / Minneapolis
MN · EV charging
EV charging in Minneapolis, MN
Here is what NREL's public data shows about EV charging in Minneapolis, MN. As of NREL AFDC data retrieved August 2026, Minneapolis has 110 public charging stations with 257 Level 2 ports, including 32 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 110Public stations
- 257Level 2 ports
- 32DC fast ports
- 11%Ports that are DC fast
⚡ 8 stations list free charging
Stations are operated across 11 networks: ChargePoint Network (72), Blink Network (17), Non-networked (6), Tesla Destination (4), and 7 more.
Connectors on record: J1772 (Level 2) at 101 stations; NACS / Tesla at 9 stations; CCS (J1772 Combo) at 5 stations; CHAdeMO at 1 station.
Of these stations, 8 list free charging and 4 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 98. Always confirm current pricing with the network before you charge.
9 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Minneapolis has 110 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Minneapolis, MN - Tesla Supercharger 1650 New Brighton Boulevard | Tesla | DC fast 10 DC fast · NACS / Tesla | June 2026 |
| Cub Foods - Tesla Supercharger 5937 Nicollet Ave | Tesla | DC fast 8 DC fast · NACS / Tesla | July 2026 |
| Cedar Commons 3040 Excelsior Blvd | eVgo Network | DC fast 6 DC fast · CCS (J1772 Combo) | August 2026 |
| North Country Ford 10401 Woodcrest Drive Northwest | Blink Network | DC fast 4 DC fast · CCS (J1772 Combo) | August 2026 |
| Luther Brookdale Honda 6800 Brooklyn Boulevard | Blink Network | DC fast 2 DC fast + 3 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | August 2026 |
| Bloomington Subaru 500 American Boulevard West | Blink Network | DC fast 1 DC fast · CCS (J1772 Combo) | August 2026 |
| WINNER GAS BROOKDALE DR 1500 Brookdale Dr | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| Government Center Garage 545 5th Ave. S. | FLASH | 12 Level 2 · J1772 (Level 2) | August 2026 |
| Riverplace Municipal Garage 30 2nd St SE | Non-networked | 8 Level 2 · J1772 (Level 2) | ⚠ April 2023 |
| Hawthorne Transportation Center 31 North 9th Street | Blink Network | 8 Level 2 · J1772 (Level 2) | August 2026 |
⚠ 10 of Minneapolis's 110 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Minneapolis?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Minneapolis
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.