MN / Ramsey
MN · EV charging
EV charging in Ramsey, MN
Here is what NREL's public data shows about EV charging in Ramsey, MN. As of NREL AFDC data retrieved October 2026, Ramsey has 5 public charging stations with 8 Level 2 ports, including 1 DC fast-charging port for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 8Level 2 ports
- 1DC fast ports
- 11%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (4), Blink Network (1).
Connectors on record: J1772 (Level 2) at 4 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station.
How Ramsey compares
- 1.7 public stations per 10,000 residents — 85% of the Minnesota rate (2).
- 0.3 DC fast ports per 10,000 residents — 16% of the Minnesota rate (1.9).
Who runs Ramsey's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| ChargePoint Network | 1 | 100% |
Last verified: NREL confirmed 100% of Ramsey's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (28,999 residents; Minnesota 5,793,151). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Ramsey has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| CNX CNX L3-1 14601 Ramsey Blvd NW | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| CNX L2-2 14601 Ramsey Blvd NW | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CNX L2-3 14601 Ramsey Blvd NW | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CNX L2-1 14601 Ramsey Blvd NW | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Ramsey Comfort Suites 6440 U.S. 10 | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Ramsey?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Ramsey
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.