ChargingAtlas

MO / Warrensburg

MO · EV charging

EV charging in Warrensburg, MO

Here is what NREL's public data shows about EV charging in Warrensburg, MO. As of NREL AFDC data retrieved October 2026, Warrensburg has 8 public charging stations with 16 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 1 network: ChargePoint Network (8).

Connectors on record: J1772 (Level 2) at 8 stations.

How Warrensburg compares

Last verified: NREL confirmed 100% of Warrensburg's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (19,998 residents; Missouri 6,245,466). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Warrensburg has 8 public stations in all — see the map above.

StationNetworkChargingConfirmed
EVERGY @UCMO -133B
305 E Clark St @ University of Central MO -
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -131B
198 W South St @ University of Central MO
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -134B
200 W South St @ University of Central MO -
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -131A
198 W South St @ University of Central MO
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -133C
305 E Clark St @ University of Central MO -
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -133A
305 E Clark St @ University of Central MO -
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -134A
200 W South St @ University of Central MO -
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EVERGY @UCMO -134C
200 W South St @ University of Central MO -
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Warrensburg?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Warrensburg

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.