NC / Lexington
NC · EV charging
EV charging in Lexington, NC
Here is what NREL's public data shows about EV charging in Lexington, NC. As of NREL AFDC data retrieved October 2026, Lexington has 8 public charging stations with 10 Level 2 ports, including 25 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 10Level 2 ports
- 25DC fast ports
- 71%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (5), Tesla (2), VIALYNK (1).
Connectors on record: J1772 (Level 2) at 5 stations; NACS / Tesla at 2 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Lexington compares
- 4 public stations per 10,000 residents — 2.4× the North Carolina rate (1.7).
- 12.6 DC fast ports per 10,000 residents — 7.4× the North Carolina rate (1.7).
Who runs Lexington's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 24 | 96% |
| ChargePoint Network | 1 | 4% |
Last verified: NREL confirmed 100% of Lexington's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (19,904 residents; North Carolina 11,046,024). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Lexington has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Lexington, NC - Plaza Parkway - Tesla Supercharger 19 Plaza Parkway | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| Lexington, NC - Tesla Supercharger 2350 S Main St | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| LEXINGTON NC PKWY PLAZA DC 11 Plaza Pkwy | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| EUHOME LEXINGTON 1900 Odell Owen Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LEXINGTON NC WINDSTREAM 209 N State St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LEXINGTON NC SOUTH MAIN #2 333 S Main St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LEXINGTON NC RAILROAD ST. 216 E 2nd Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Jerry Hunt Supercenter - Main Showroom 418 Piedmont Dr | VIALYNK | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Lexington?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Lexington
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.