ChargingAtlas

NC / Raeford

NC · EV charging

EV charging in Raeford, NC

Here is what NREL's public data shows about EV charging in Raeford, NC. As of NREL AFDC data retrieved October 2026, Raeford has 7 public charging stations with 12 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 2 networks: ChargePoint Network (6), Blink Network (1).

Connectors on record: J1772 (Level 2) at 7 stations.

How Raeford compares

Last verified: NREL confirmed 100% of Raeford's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (4,578 residents; North Carolina 11,046,024). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Raeford has 7 public stations in all — see the map above.

StationNetworkChargingConfirmed
Cape Fear Valley Hoke Hospital
300 Medical Pavilion Drive
Blink Network 4 Level 2 · J1772 (Level 2) October 2026
PEMBROKE HQ CP2
8344 Fayetteville Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
NORTH CP1
8344 Fayetteville Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
SOUTH POINTE CHARGE POINT 1
1002 South Pointe Drive
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026
SOUTH POINTE CHARGE POINT 2
1002 South Pointe Drive
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026
SOUTH POINTE CHARGE POINT 3
1002 South Pointe Drive
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026
SOUTH POINTE CHARGE POINT 4
1002 South Pointe Drive
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Raeford?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Raeford

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.