ChargingAtlas

NC / Waynesville

NC · EV charging

EV charging in Waynesville, NC

Here is what NREL's public data shows about EV charging in Waynesville, NC. As of NREL AFDC data retrieved October 2026, Waynesville has 12 public charging stations with 15 Level 2 ports, including 11 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 4 networks: ChargePoint Network (5), Non-networked (3), EV Connect (3), eVgo Network (1).

Connectors on record: J1772 (Level 2) at 8 stations; CHAdeMO at 5 stations; CCS (J1772 Combo) at 5 stations.

Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 10. Always confirm current pricing with the network before you charge.

How Waynesville compares

Who runs Waynesville's DC fast charging

Network DC fast ports Share
eVgo Network 5 45%
EV Connect 4 36%
ChargePoint Network 2 18%

Last verified: NREL confirmed 83% of Waynesville's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (10,709 residents; North Carolina 11,046,024). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Waynesville has 12 public stations in all — see the map above.

StationNetworkChargingConfirmed
Pilot Travel Center 393
3712 Crabtree Road
eVgo Network DC fast 5 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
88 Montgomery St Parking Lot
88 Montgomery St
EV Connect DC fast 2 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) October 2026
Haywood Community College West Waynesville Annex
23 Hendrix Street
EV Connect DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
HAYWOOD EMC STATION1
5083 Jonathan Creek Rd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
LOCAL MARKET #204
5083 Jonathan Creek Rd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
Ingles Market
201 Barber Blvd
Non-networked 4 Level 2 · J1772 (Level 2) ⚠ January 2025
Ingles Market
1670 Brown Ave
Non-networked 2 Level 2 · J1772 (Level 2) September 2026
Recreation Center
550 Vance St
EV Connect 2 Level 2 · J1772 (Level 2) October 2026
HAYWOOD EMC HEMC LEVEL 2 A
376 Grindstone Road
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
Haywood EMC
376 Grindstone Rd
Non-networked 1 Level 2 · J1772 (Level 2) ⚠ May 2024

⚠ 2 of Waynesville's 12 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Waynesville?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Waynesville

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.