NC / Weaverville
NC · EV charging
EV charging in Weaverville, NC
Here is what NREL's public data shows about EV charging in Weaverville, NC. As of NREL AFDC data retrieved October 2026, Weaverville has 4 public charging stations with 3 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 4Public stations
- 3Level 2 ports
- 2DC fast ports
- 40%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 3 networks: ChargePoint Network (2), Tesla Destination (1), Non-networked (1).
Connectors on record: CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station; J1772 (Level 2) at 1 station.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 2. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Weaverville compares
- 8.3 public stations per 10,000 residents — 4.9× the North Carolina rate (1.7).
- 4.2 DC fast ports per 10,000 residents — 2.5× the North Carolina rate (1.7).
Who runs Weaverville's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| ChargePoint Network | 2 | 100% |
Last verified: NREL confirmed 100% of Weaverville's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (4,799 residents; North Carolina 11,046,024). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Weaverville has 4 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| GPM INVESTMENTS 6051 DC1 171 Weaver Blvd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| GPM INVESTMENTS 6051 DC2 171 Weaver Blvd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Ingles Market 140 Weaver Blvd | Non-networked | 2 Level 2 · J1772 (Level 2) | October 2025 |
| Inn On Main - Tesla Destination 88 S Main St | Tesla Destination | 1 Level 2 · NACS / Tesla | August 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Weaverville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Weaverville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.