ND / Dickinson
ND · EV charging
EV charging in Dickinson, ND
Here is what NREL's public data shows about EV charging in Dickinson, ND. As of NREL AFDC data retrieved October 2026, Dickinson has 6 public charging stations with 8 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 6Public stations
- 8Level 2 ports
- 10DC fast ports
- 56%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 5 networks: Non-networked (2), Tesla (1), ChargePoint Network (1), FORD_CHARGE (1), and 1 more.
Connectors on record: J1772 (Level 2) at 4 stations; NACS / Tesla at 2 stations; CCS (J1772 Combo) at 1 station.
Of these stations, 2 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Dickinson compares
- 2.3 public stations per 10,000 residents — 1.6× the North Dakota rate (1.4).
- 3.9 DC fast ports per 10,000 residents — 2.2× the North Dakota rate (1.8).
Who runs Dickinson's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 80% |
| FORD_CHARGE | 2 | 20% |
Last verified: NREL confirmed 67% of Dickinson's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (25,695 residents; North Dakota 796,568). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Dickinson has 6 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Dickinson, ND - Tesla Supercharger 1681 3rd Avenue West | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Red Rock Ford of Dickinson Inc 272 34th St W | FORD_CHARGE | DC fast 2 DC fast · CCS (J1772 Combo) | October 2026 |
| Roosevelt Grand Dakota, SureStay Collection by Best Western - Tesla Destination 532 15th St W | Tesla Destination | 4 Level 2 · J1772 (Level 2), NACS / Tesla | August 2026 |
| Dickinson Museum Center & Badlands 188 Museum Dr E | Non-networked | 2 Level 2 · J1772 (Level 2) | August 2025 |
| DPM DELIVERY BAY 2391 I-94BL | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| Sax Motor Chevrolet 52 21st St E | Non-networked | 1 Level 2 · J1772 (Level 2) | June 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Dickinson?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Dickinson
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.