NJ / Cherry Hill Township
NJ · EV charging
EV charging in Cherry Hill Township, NJ
Here is what NREL's public data shows about EV charging in Cherry Hill Township, NJ. As of NREL AFDC data retrieved October 2026, Cherry Hill Township has 5 public charging stations with 18 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 18Level 2 ports
- 4DC fast ports
- 18%Ports that are DC fast
Stations are operated across 2 networks: Blink Network (3), ChargePoint Network (2).
Connectors on record: J1772 (Level 2) at 4 stations; CCS (J1772 Combo) at 1 station.
How Cherry Hill Township compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Cherry Hill Township doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, New Jersey has 2.2 public stations and 2.3 DC fast ports per 10,000 residents.
Who runs Cherry Hill Township's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Blink Network | 4 | 100% |
Last verified: NREL confirmed 100% of Cherry Hill Township's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Cherry Hill Township has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Winner Ford - DCFC 250 Haddonfield-Berlin Road | Blink Network | DC fast 4 DC fast · CCS (J1772 Combo) | October 2026 |
| 202 Park 202 Park Boulevard | Blink Network | 8 Level 2 · J1772 (Level 2) | October 2026 |
| Winner Ford - Series 250 Haddonfield-Berlin Road | Blink Network | 6 Level 2 · J1772 (Level 2) | October 2026 |
| CHT MUNICIPAL ST2 820 Mercer Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CHT MUNICIPAL ST1 820 Mercer Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Cherry Hill Township?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Cherry Hill Township
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.