NJ / Edison
NJ · EV charging
EV charging in Edison, NJ
Here is what NREL's public data shows about EV charging in Edison, NJ. As of NREL AFDC data retrieved October 2026, Edison has 33 public charging stations with 59 Level 2 ports, including 34 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 33Public stations
- 59Level 2 ports
- 34DC fast ports
- 37%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (27), Tesla (2), OpConnect (1), LOOP (1), and 2 more.
Connectors on record: J1772 (Level 2) at 28 stations; NACS / Tesla at 4 stations; CCS (J1772 Combo) at 2 stations.
4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Edison compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Edison doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, New Jersey has 2.2 public stations and 2.3 DC fast ports per 10,000 residents.
Who runs Edison's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 24 | 71% |
| Electrify America | 10 | 29% |
Last verified: NREL confirmed 100% of Edison's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Edison has 33 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Edison, NJ - Tesla Supercharger 55 Parsonage Rd. | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| Milbrook Edison Mall (Edison, NJ) 765-775 US-1 S | Electrify America | DC fast 10 DC fast · CCS (J1772 Combo) | October 2026 |
| Edison, NJ - U.S. Route 1 - Tesla Supercharger 580 U.S. Route 1 | Tesla | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | June 2026 |
| Edison 987 US 1 | LOOP | 11 Level 2 · J1772 (Level 2) | July 2026 |
| 687 Rt 1 687 Rt 1 | VIALYNK | 6 Level 2 · J1772 (Level 2) | October 2026 |
| Garden Homes - Millbrook Village North Sunrise Drive | OpConnect | 4 Level 2 · J1772 (Level 2) | October 2026 |
| HOMEWOODEWRWO STATION 1 100 Parsonage Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EDISON 27 BROAD EDISON #2 2147 NJ-27 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| EDISON 27 BROAD EDISON #1 2147 Lincoln Hwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OR VOLVO STATION 3 731 US-1 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Edison?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Edison
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.