NJ / Madison
NJ · EV charging
EV charging in Madison, NJ
Here is what NREL's public data shows about EV charging in Madison, NJ. As of NREL AFDC data retrieved October 2026, Madison has 26 public charging stations with 49 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 26Public stations
- 49Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 4 networks: AMPUP (14), Blink Network (10), VIALYNK (1), ChargePoint Network (1).
Connectors on record: J1772 (Level 2) at 26 stations.
Of these stations, 22 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 4. Always confirm current pricing with the network before you charge.
How Madison compares
- 15.7 public stations per 10,000 residents — 7.1× the New Jersey rate (2.2).
- 0 DC fast ports per 10,000 residents (New Jersey: 2.3).
Last verified: NREL confirmed 46% of Madison's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (16,555 residents; New Jersey 9,500,851). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Madison has 26 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Madison Mall Apartments 296 Main Street | VIALYNK | 14 Level 2 · J1772 (Level 2) | October 2026 |
| Madison Recreational Center (MRC #1 and #2) 184 Ridgedale Avenue | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Madison Community Pool 105 Rosedale Ave. | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Prospect Street Parking Lot (#1 and #2) 29 Prospect Street | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Madison Public Library 39 Keep Street | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Madison Community Arts Center 10 Kings Road | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Elmer Street Lot 1 Elmer Street | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Kings Road Lot 62 Kings Road | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| GREEN AVENUE LOT Green Avenue | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| The Madison Plaza 306 Main Street | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
⚠ 14 of Madison's 26 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Madison?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Madison
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.