ChargingAtlas

NJ / Wall Township

NJ · EV charging

EV charging in Wall Township, NJ

Here is what NREL's public data shows about EV charging in Wall Township, NJ. As of NREL AFDC data retrieved October 2026, Wall Township has 11 public charging stations with 27 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: ChargePoint Network (9), FORD_CHARGE (1), EVGATEWAY (1).

Connectors on record: J1772 (Level 2) at 10 stations; CCS (J1772 Combo) at 1 station.

How Wall Township compares

We only compute a per-resident rate where NREL's city name lines up with one Census city. Wall Township doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, New Jersey has 2.2 public stations and 2.3 DC fast ports per 10,000 residents.

Who runs Wall Township's DC fast charging

Network DC fast ports Share
FORD_CHARGE 4 100%

Last verified: NREL confirmed 100% of Wall Township's stations in the 12 months before this snapshot, most recently in October 2026.

Notable charging stations

The largest sites by port count, DC fast first. Wall Township has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
Seabreeze Ford
1701 NJ-35
FORD_CHARGE DC fast 4 DC fast · CCS (J1772 Combo) October 2026
Spring Oak 1514 NJ
1514 NJ-138
EVGATEWAY 10 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #1
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #2
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #5
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #6
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #7
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #8
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #4
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GST CHRGNG L2 T3408 #3
1825 NJ-35 Wall Target
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Wall Township?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Wall Township

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.