ChargingAtlas

NM / Farmington

NM · EV charging

EV charging in Farmington, NM

Here is what NREL's public data shows about EV charging in Farmington, NM. As of NREL AFDC data retrieved October 2026, Farmington has 12 public charging stations with 12 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 5 networks: ChargePoint Network (7), Tesla (2), Tesla Destination (1), EV Connect (1), and 1 more.

Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 4 stations; NACS / Tesla at 3 stations; CHAdeMO at 1 station.

Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 11. Always confirm current pricing with the network before you charge.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Farmington compares

Who runs Farmington's DC fast charging

Network DC fast ports Share
Tesla 12 67%
ChargePoint Network 3 17%
LOOP 2 11%
EV Connect 1 6%

Last verified: NREL confirmed 100% of Farmington's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (46,262 residents; New Mexico 2,130,256). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Farmington has 12 public stations in all — see the map above.

StationNetworkChargingConfirmed
Farmington, NM - East Main Street - Tesla Supercharger
4900 E Main St
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Farmington, NM - Tesla Supercharger
4200 Sierra Vista Drive
Tesla DC fast 4 DC fast · NACS / Tesla June 2026
3401 E 30th St
3401 E 30th St
LOOP DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
FEUS LVL3EV#1
1432 West Navajo Street
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) October 2026
HI COUNTRY KIA ABB STATION 1
4004 E Main St
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) October 2026
HI Country Buick GMC
1700 E SAN JUAN BLVD
EV Connect DC fast 1 DC fast · CCS (J1772 Combo) October 2026
Casa Blanca Inn - Tesla Destination
505 E La Plata St
Tesla Destination 2 Level 2 · NACS / Tesla August 2026
FEUS BERG PARK
1711 San Juan Blvd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
FEUS DOWNTOWN PRKING
105 N Orchard Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
FEUS FARM. LIBRARY
2000 E 20th St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Farmington?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Farmington

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.