NY / Bedford Hills
NY · EV charging
EV charging in Bedford Hills, NY
Here is what NREL's public data shows about EV charging in Bedford Hills, NY. As of NREL AFDC data retrieved October 2026, Bedford Hills has 10 public charging stations with 14 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 14Level 2 ports
- 4DC fast ports
- 22%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (9), FLO (1).
Connectors on record: J1772 (Level 2) at 6 stations; CHAdeMO at 4 stations; CCS (J1772 Combo) at 4 stations.
How Bedford Hills compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Bedford Hills doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, New York has 2.8 public stations and 1.8 DC fast ports per 10,000 residents.
Who runs Bedford Hills's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| ChargePoint Network | 4 | 100% |
Last verified: NREL confirmed 100% of Bedford Hills's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Bedford Hills has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| BEDFORDCDJR CPE250 #4 531 North Bedford Road | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| BEDFORDCDJR CPE250 #3 531 North Bedford Road | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| BEDFORDCDJR CPE250 #2 531 North Bedford Road | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| BEDFORDCDJR CPE250 #1 531 North Bedford Road | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Mavis Tire Bedford Road 789 Bedford Rd | FLO | 4 Level 2 · J1772 (Level 2) | October 2026 |
| BEDFORD_EV TOWN COURT 2 307 Bedford Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BEDFORDEV METRO NORTH RR1 11 Railroad Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BEDFORDEV TOWN HALL 321 Bedford Rd. | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BEDFORDEV MEMORIAL PARK 2 60 Haines Rd. | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| BEDFORD_EV CHERRY STREET 425 Cherry St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Bedford Hills?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Bedford Hills
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.