ChargingAtlas

NY / Mechanicville

NY · EV charging

EV charging in Mechanicville, NY

Here is what NREL's public data shows about EV charging in Mechanicville, NY. As of NREL AFDC data retrieved October 2026, Mechanicville has 11 public charging stations with 22 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 2 networks: ChargePoint Network (10), VIALYNK (1).

Connectors on record: J1772 (Level 2) at 11 stations.

How Mechanicville compares

Last verified: NREL confirmed 100% of Mechanicville's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (5,083 residents; New York 19,867,248). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Mechanicville has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
MICHAELSGRP MICHAELS GROUP1
1 Marions Way
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
MICHAELSGRP MICHAELS GROUP2
1 Marion's way
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
Mechanicville Public Library
190 N Main St.
VIALYNK 2 Level 2 · J1772 (Level 2) October 2026
211 EV STATIONS STATION-1
211 North Main Street
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
211 EV STATIONS STATION-2
211 North Main Street
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
211 EV STATIONS STATION-3
211 North Main Street
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
211 EV STATIONS STATION-4
211 North Main Street
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
211 EV STATIONS STATION-5
211 North Main Street
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HUDSON HEIGHTS STATION 1
700 Broadleaf Path
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HUDSON HEIGHTS STATION 2
700 Broadleaf Path
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Mechanicville?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Mechanicville

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.