ChargingAtlas

NY / Patchogue

NY · EV charging

EV charging in Patchogue, NY

Here is what NREL's public data shows about EV charging in Patchogue, NY. As of NREL AFDC data retrieved October 2026, Patchogue has 14 public charging stations with 48 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: ChargePoint Network (10), FLO (3), QUICKCHARGE (1).

Connectors on record: J1772 (Level 2) at 14 stations.

How Patchogue compares

Last verified: NREL confirmed 93% of Patchogue's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (12,447 residents; New York 19,867,248). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Patchogue has 14 public stations in all — see the map above.

StationNetworkChargingConfirmed
Patchogue - Train Station
48 Division Street
FLO 16 Level 2 · J1772 (Level 2) October 2026
Patchogue - Municipal parking lot
Oak Street
FLO 4 Level 2 · J1772 (Level 2) October 2026
Patchogue - Court House Village Parking Lot
150 w Main Street
FLO 4 Level 2 · J1772 (Level 2) October 2026
Apollo Stones
619 Medford Ave
QUICKCHARGE 4 Level 2 · J1772 (Level 2) ⚠ unknown
PATCHVILLAGE PATCHOGUE
14 Baker St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HEATHERWOOD PATCHOGUE
99 Waverly Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
SJC SJC
155 W Roe Blvd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
BROWNS CDJR
483 Medford Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
BROWNS ALFA ROMEO
483 Medford Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
GPM GROVE A
3 Grove Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

⚠ 1 of Patchogue's 14 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Patchogue?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Patchogue

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.