ChargingAtlas

OH / Chillicothe

OH · EV charging

EV charging in Chillicothe, OH

Here is what NREL's public data shows about EV charging in Chillicothe, OH. As of NREL AFDC data retrieved October 2026, Chillicothe has 9 public charging stations with 9 Level 2 ports, including 11 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: ChargePoint Network (7), Tesla (1), EV Connect (1).

Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Chillicothe compares

Who runs Chillicothe's DC fast charging

Network DC fast ports Share
Tesla 8 73%
ChargePoint Network 2 18%
EV Connect 1 9%

Last verified: NREL confirmed 100% of Chillicothe's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (21,769 residents; Ohio 11,883,304). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Chillicothe has 9 public stations in all — see the map above.

StationNetworkChargingConfirmed
Chillicothe, OH - Tesla Supercharger
1080 N. Bridge Street
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
YOCTANGEE COC 1
37 E Water St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
YOCTANGEE COC 2
37 E Water St Side
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
Coughlin Chevrolet Buick GMC Of Chillicothe
1221 N BRDGE ST
EV Connect DC fast 1 DC fast · CCS (J1772 Combo) October 2026
ADENA STATION 1
272 Hospital rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
YOCTANGEE CHILLICOTHE
37 E Water St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
YOCTANGEE YOCTANGEEPARK2
37 E Water St Side
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
ADENA STATION 2
272 Hospital rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
NOURSE TOYOTA TOYOTA SRV
423 N Bridge St
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Chillicothe?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Chillicothe

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.