OH / Newark
OH · EV charging
EV charging in Newark, OH
Here is what NREL's public data shows about EV charging in Newark, OH. As of NREL AFDC data retrieved October 2026, Newark has 11 public charging stations with 17 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 17Level 2 ports
- 2DC fast ports
- 11%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (10), Blink Network (1).
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
How Newark compares
- 2.1 public stations per 10,000 residents — 1.3× the Ohio rate (1.6).
- 0.4 DC fast ports per 10,000 residents — 31% of the Ohio rate (1.3).
Who runs Newark's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| ChargePoint Network | 2 | 100% |
Last verified: NREL confirmed 100% of Newark's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (51,424 residents; Ohio 11,883,304). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Newark has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| NEWARK OHIO STATION 1 51 E Church St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| KIA OF NEWARK ABB 1 1475 Mt Vernon Rd | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | October 2026 |
| PNB NTT 57 N 3rd St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| PNB PARK 22 22 S 1st St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LMH STATION 1 1320 W Main St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Weekly Electric 1960 Mount Vernon Road | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LMH 2000 TAMARACK 1 2000 Tamarack Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LP FLATS LP FLATS 1 1401 Log Pond Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LMH LMH ED LOT 2 1320 West Main Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| KIA OF NEWARK CT4000 1475 Mt Vernon Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Newark?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Newark
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.