OH / West Unity
OH · EV charging
EV charging in West Unity, OH
Here is what NREL's public data shows about EV charging in West Unity, OH. As of NREL AFDC data retrieved October 2026, West Unity has 4 public charging stations with 0 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 4Public stations
- 0Level 2 ports
- 24DC fast ports
- 100%Ports that are DC fast
Stations are operated across 2 networks: Electrify America (2), Tesla (2).
Connectors on record: CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 2 stations.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How West Unity compares
- 23.1 public stations per 10,000 residents — 14.4× the Ohio rate (1.6).
- 138.6 DC fast ports per 10,000 residents — 106.6× the Ohio rate (1.3).
Who runs West Unity's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 16 | 67% |
| Electrify America | 8 | 33% |
Last verified: NREL confirmed 100% of West Unity's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (1,731 residents; Ohio 11,883,304). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. West Unity has 4 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| West Unity, OH - Indian Meadow Service Plaza - Tesla Supercharger 21738 Co Rd M-50 | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| West Unity, OH - Tiffin River Service Plaza - Tesla Supercharger 21747 Co Rd M | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Tiffin River Service Plaza (West Unity, OH) 21747 Co Rd M-50 | Electrify America | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Indian Meadow Service Plaza (West Unity, OH) 21738 CO RD M-50 | Electrify America | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in West Unity?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near West Unity
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.